M2 Civils were appointed by the Principal Contractor to install 60Lm of triple 1800mm diameter polysewer, at depths of 4.5m within soft landscaped area to provide additional storage capacity within the existing sewer system to prevent localised flooding in the area.
Also 450M of 300mm diameter MDPE pipe was installed using No dig technology replacing an existing fragile pumping main, project completed on time and within budget.