Newark Sewer Strategy


Project Date

November 2016 - Jun 2019

Client

Severn Trent Water

Location

Newark, Nottinghamshire

Principal Contractor

Barhale / North Midland Construction

Project Value

£60m

About the Project

M2 Civils were appointed by the client to install 3000m of concrete pipes with sizes ranging from 375mm to 1500mm to depths of 6.5m in very challenging ground conditions to alleviate major foul and surface water flooding in the area.

The upgrade of the existing surface water gully collection system. The scheme requires major liaisons with the authorities and residents due to the sensitivity of location and services. To date (May 2019), the scheme is on target and within budgets.

 

 